Investigation of Risk Management Status in IT projects, KPK, Peshawar

Abstract

The objective of this study is to explore the identification, understanding and application of risk management in information technology (IT) projects in, Peshawar, Pakistan. IT sector holds prominent place economically throughout the globe. However, high failure rate is associated with IT projects, and factors pertaining to risk management is one of the main causes of this failure. Risk management processes and procedures are considered a newly emerging field in Pakistan, so there is need to explore and tackle the status of risk management in IT sector. The adopted methodology of research is quantitative in nature, in the form of survey as research strategy. Primary data is collected by means of questionnaire as a data collection tool. The target population is 40 IT companies of Peshawar registered with Khyber Pakhtunkhwa IT Board and the entire population of IT firms are taken as a sample size. The research results highlight the importance of knowledge base in risk management as well as its role in risk mitigation; however, the availability of databases and tools and techniques for managing knowledge of risk management are found not up to the significant mark. There is a need to develop databases and tools for managing information about risk. A similar study with longitudinal design should be conducted on a considerably bigger sample size through various sectors including IT, Health, mining, and others which allow a more detailed analysis to tackle the whole scenario of the risk management status.

Country : Pakistan

1 Sajid Ali2 Shamsher khan3 Noor Muhammad4 Fasial Afzal5 Sanaullah

  1. Institute of Management Sciences, Peshawar, Pakistan
  2. Department of Mechanical Engineering, University of Engineering and Technology, Peshawar, Pakistan
  3. University of Engineering and Technology, USPCASE, Peshawar, Pakistan
  4. Department of Electrical Engineering, IQRA National University, Peshawar, Pakistan
  5. Department of Electrical Engineering, City university of Science and Technology, Peshawar, Pakistan

IRJIET, Volume 7, Issue 11, November 2023 pp. 638-647

doi.org/10.47001/IRJIET/2023.711084

References

  1. Ali, H., Naseem, I. (2016). Identification of Risk Factors in Implementation of IT Projects in Pakistan. American Journal of Business and Management, 5, (4), 140-151.
  2. Alhawari, S., Karadsheh, L., Talet, A., & Mansour, E. (2012). Knowledge-Based Risk Management framework for Information Technology project. International Journal of Information Management, 32(1), 50–65. https://doi.org/10.1016/j.ijinfomgt.2011.07.002
  3. Al-Shibly, Haitham H., Louzi, B. M., & Hiassat, M. a. (2013). The impact of risk management on construction projects success from the employee’s perspective. Interdisciplinary Journal of Contemporary Research in Business, 12–43.
  4. Bunton, T. E., & Brewer, J. L. (2012, October). Discovering workplace motivators for the millennial generation of IT employees. In Proceedings of the 1st Annual conference on Research in information technology (pp. 13-18).
  5. Chapman, C. & Ward, S. (2003). Project risk management: Processes, techniques and insights (Second edn.). Chichester: Wiley.
  6. Chua, A.Y.K. (2009). Exhuming IT projects from their graves: an analysis of eight failure cases and their risk factors. Journal of Computer Information Systems, 9 (3), 31-39.
  7. Cooper, L.P. (2003). A research agenda to reduce risk in new product development through knowledge management: a practitioner perspective. Journal of Engineering and Technology Management, 20 (2), 117-140.
  8. Creswell, J. W. (2014). A concise introduction to mixed methods research. SAGE publications.
  9. Debono, R. (2016). Project risk management, (April).
  10. Dey, P. K., Kinch, J., & Ogunlana, S. O. (2007). Managing risk in software development projects: a case study. Industrial Management & Data Systems.
  11. Fenton, N., & Neil, M. (2012). Risk assessment and decision analysis with Bayesian networks. Crc Press.
  12. Gauthier, J. B., & Ika, L. A. (2012). Foundations of project management research: An explicit and six-facet ontological framework. Project Management Journal, 43(5), 5-23.
  13. Haneef, S., Riaz, T., Ramzan, M., Rana, M., A., Ishaq, H., M., Karim, Y. (2012) Impact of Risk Management on Non-Performing Loans and Profitability of Banking Sector of Pakistan. International Journal of Business and Social Science, 3 (7), 307-315.
  14. Hartono, B., Sulistyo, S. R., Praftiwi, P. P., & Hasmoro, D. (2014). Project risk: Theoretical concepts and stakeholders’ perspectives. International Journal of Project Management, 32(3), 400–411. https://doi.org/10.1016/j.ijproman.2013.05.011
  15. Hodgson, D., & Cicmil, S. (Eds.). (2006). Making projects critical. Macmillan International Higher Education.
  16. Index, N. R. (2016). World Economic Forum. –hhttp. reports. weforum. org/global-information-technology-report-2016/networked-readiness-index.
  17. Javani, B., Rwelamila, P. M. D (2016). Risk management in IT projects – a case of the South African public sector. International Journal of Project Management, 9 (2), 389-413.
  18. Koopman, P. (2010, October). Risk areas in embedded software industry projects. In Proceedings of the 2010 Workshop on Embedded Systems Education (pp. 1-8).
  19. Kutsch, E. and Hall, M. (2009). The rational choice of not applying project risk management in information technology projects. Project Management Journal, 40 (3), 72-81.
  20. Kwak, Y.H. and Stoddard, J. (2004), “Project risk management: lessons learned from software development environment”, Tec novation, Vol. 24 No. 11, pp. 915-20.
  21. Lawton, G. (2001). Knowledge Management: Ready for Prime Time? IEEE Computer, 34, (2), 12-14.
  22. Leedy, P. D., & Ormrod, J. (2010). E. 2010. Practical research: Planning and design. Ohio, Merrill Prentice Hall.
  23. Masood, R., & Choudhry, R. M. (2010). Identification of risk factors for construction contracting firms-Encompassing mitigation stance. In Proc., 2nd International Conference on Construction in Developing Countries, Florida International University, Miami, NED University of Engineering and Technology, Karachi, Services and Maintenance Construction Engineering Services, Cairo, Egypt.
  24. Matta, N. F., & Ashkenas, R. N. (2003). Why good projects fail anyway. Harvard business review, 81(9), 109-116.
  25. Mia, M. B., & Ramage, M. (2011). IT project management in developing countries: Approaches and factors affecting success in the microfinance sector of Bangladesh.
  26. Moynihan, T. (2002). Coping with IS/IT Risk Management: The Recipes of experienced project managers. Springer Science & Business Media.
  27. Nasscom. (2017, 2019). The IT-BPO Sector in India: Strategic Review.
  28. Neef, D. (2005). Managing corporate risk through better knowledge management. The Learning Organization, 12 (2), 112-124.
  29. Project Management Institute (PMI). (2013). A Guide to Project Management Body of Knowledge, PMI Publications, Institute (Vol. 5). https://doi.org/10.1002/pmj.20125.
  30. Saunders, M., Lewis, P., & Thornhill, A. (2009). Research Methods for Business Students (5th Ed.) England: Pearson Education Limited.
  31. Saunders, M., & Lewis, P. (2012). Doing research in business & management: An essential guide to planning your project. Pearson.
  32. Sharma, A. and Gupta, A. (2011). Impact of organizational climate and demographics on project specific risks in context to Indian software industry. International Journal of Project Management, 30 (2), 176-187.
  33. Taylor, H., Artman, E. and Woelfer, J.P. (2008), “Information technology project risk management: bridging the gap between research and practice”, Journal of Information Technology, Vol. 27 No. 1, pp. 17-34.
  34. The Standish Group International (2016) Extreme CHAOS. The Standish Group International.
  35. Zhang, X. (2017). Essays in Credit Risk Management. http://theses.gla.ac.uk/ 7988/