The high
volume of vehicles at Simpang Joglo, which caused traffic congestion, became a
particular focus for the government. The construction of the bridge on this
railway line of PT. Wijaya Karya (WIKA) is located at KM 105+499 to KM 105
+772, with a bridge stretch of 272.80 m and a width of 14.1 m. The problems
raised in this study include the effect of the implementation of bored pile
work on the environment, whether the solution to the problem affects cost and
time, and how much the carrying capacity of the bored pile is at this stage,
using qualitative research methods and quantitative research methods. After
observations and interviews with the community, it can be known that the bored
pile foundation work on the Railway Elevated Line Construction Project between
Solo Balapan - Kadipiro at KM 104 + 700 to KM 107 + 000 (phase 1) has several
impacts that affect the work environment and the community environment,
including noise, road damage, air pollution, land collapse due to drilling
damage to tools, etc. From this impact, there are several solutions, including
repairing road facilities, changing tools, etc. From the results of the
analysis of the calculation of the bearing capacity of the foundation at Pier
11, a value of 28135.397 kN was obtained. The benefits of this research are
that it can find out problems and solutions for work, know the impact on time
and cost, and know the carrying capacity of a bored pile.